Socioeconomic study: Ethiopia–Kenya Power Interconnection Project

Client
Kenya Electricity Transmission Company (KETRACO) — Sub-contracted by Gamma Systems
Period
February – May 2012
Location
Counties and towns along the 612 km Kenyan section of the line
Lead consultant
Jack Odero
Scale
612 km right of way

The brief of our assignment was to carry out an extensive socioeconomic study of line counties and towns covered by the proposed power line from Ethiopia to Kenya, specifically focusing on the 612km in the Kenyan side.

This was to inform the drawing up of a Resettlement Action Plan (RAP) to compensate households along the power line's Right of Way (RoW). Our mandate was to carry out a desk review of socioeconomic and demographic indicators along the RoW and follow it up with a field data collection to verify secondary data collected in the desk study.

Our role

  1. 1Desk review of socio-economic and demographic indicators along the right of way
  2. 2Field data collection to verify the secondary data

Methods

Desk reviewField data collectionSocio-economic survey

Outcomes

  • Evidence to inform the Resettlement Action Plan (RAP) compensating households along the right of way